Does sintering after refilling require a holding period

May 07, 2026

Leave a message

Sintering after refilling requires a holding period of 1-2 hours. This is a crucial step to ensure sufficient recrystallization of magnesium oxide grains and the formation of a dense and stable insulating structure.

Necessity and Process Requirements of Holding

Holding time: 1-2 hours, conducted in an inert atmosphere (such as nitrogen) at 800-1000℃;

Core functions:

To promote the recrystallization process of magnesium oxide particles, increasing structural density;

To eliminate internal stress, enhancing the voltage resistance and thermal stability of the insulation layer;

To prevent microcracks or localized porosity caused by uneven temperature.

Holding is an indispensable step in the sintering process, directly affecting the lifespan and safety of the heating element after repair.

Complete Sintering Process Timeline

Stage

Temperature

Time

Description

Heating

Room temperature → 800–1000℃

1–1.5 hours

Uniform heating, avoiding thermal shock

Holding

800–1000℃

1–2 hours

Key stage: Achieving grain recrystallization

Cooling

1000℃ → <200℃

1–2 hours

Natural cooling within the furnace, preventing cracking

The entire sintering and cooling process must be completed in a dust-free, humidity-controlled (RH≤30%) cleanroom to ensure no contamination.

info-1328-915

Send Inquiry
Contact usif have any question

You can either contact us via phone, email or online form below. Our specialist will contact you back shortly.

Contact now!