How to maintain fixed-thread type platinum resistance temperature sensors

Jul 26, 2019

Leave a message

Regular Maintenance Cycle and Inspection Items

Monthly Inspection: Visually inspect the surface of the protective tube for corrosion, scratches, and deposits; confirm that the junction box sealing ring is not aged or cracked, and that the terminal connections are not loose or oxidized.

Every 6 Months Inspection:

Measure the insulation resistance between the lead wires and the protective tube using a megohmmeter (500V DC), ensuring it is ≥100 MΩ (ideal value ≥200 MΩ);

Check for loose threaded connections and retighten to the recommended value using a torque wrench (M12×1.5: 15–20 N·m);

Clean the outer surface of the probe, using a soft brush and lint-free cloth to remove dust and oil stains. High-pressure water guns or corrosive solvents are strictly prohibited.

Annual Calibration:

According to the "JJG 229-2010 Industrial Platinum and Copper Resistance Thermometer Verification Regulations," perform multi-point calibration (0℃, 100℃, 300℃) in a constant temperature bath (ice point bath or dry well furnace);

If the accuracy deviation exceeds Class A ±(0.15 + 0.002|t|)℃ or the resistance value deviates from the nominal value by ±0.5 Ω, calibration or replacement is required;

After calibration, issue a certificate compliant with ISO/IEC 17025, archive it for future reference, and meet GMP, FDA, and other compliance requirements.

 

Common Fault Diagnosis and Troubleshooting Measures

Fault Phenomenon

Possible Cause

Solution

Insulation resistance decrease (<100 MΩ)

Junction box dampness, seal failure, lead wire insulation aging, dust contamination

1. Disconnect the power and open the junction box, clean the inside with anhydrous ethanol;2. Dry in a 40℃ drying oven for 30 minutes;3. Replace the PTFE sealing ring or reseal with high-temperature silicone;4. Reassemble after the insulation resistance test meets the standard.

Temperature Signal Drift (Unstable or Deviating Readings)

Platinum wire thermal cycling fatigue, poor lead contact, carbon buildup on the inner wall of the protective tube

1. Measure the resistance value at room temperature using a high-precision bridge and compare it to the nominal value;2. Check if the three-wire/four-wire connection is correct and if the terminals are oxidized;3. If the resistance value continuously deviates by >±0.5 Ω, replace the probe; self-repair of the platinum wire is prohibited.

Threaded Seal Leakage

Seal material carbonization, thread damage, failure to use high-temperature sealant

1. Shut down and depressurize before removing the probe;2. Remove the old sealant and reapply high-temperature thread sealant (such as Loctite 577);3. The use of PTFE tape is strictly prohibited (>200℃ failure);4. Reinstall and perform a pressure test (1.25 times the working pressure, hold for 10 minutes).

Slow Response Time

Scaling on the inner wall of the protective tube, drying of thermal conductive grease, insufficient insertion depth

1. After shutdown, remove the probe and clean the inner wall with a neutral cleaning agent and a soft brush;2. Reapply a small amount of high-conductivity thermal grease (≤0.1 mL);3. Ensure the sensing end insertion depth is ≥10 mm, away from the wall thermal interference zone.

 

Industry-Specific Maintenance Requirements

Pharmaceutical and Food (CIP/SIP):

Use pure steam or compliant cleaning agents at ≤135℃ during cleaning, avoiding mechanical scraping;

The junction box must be an IP67 waterproof sealed structure to prevent cleaning fluid from entering;

All maintenance operations must be recorded in the electronic batch record system, complying with GMP traceability requirements.

Chemical and Petrochemical:

Intergranular corrosion and stress cracking of the protective tube (316L/Hastelloy) must be checked during each major overhaul;

In high-pressure environments (>5 MPa), online disassembly is prohibited; operations must be performed after shutdown and depressurization.

Power and Energy:

In steam pipeline environments, special attention must be paid to preventing thermal shock, avoiding inserting the probe directly from a high-temperature environment into a cold medium;

Annual calibration must be performed according to the mandatory standard "JJG 229-2010" and cannot be delayed.

 

Maintenance Taboos and Safety Regulations

Prohibited:

Using power tools to forcibly screw in/out;

Disassembling under pressure or high temperature;

Touching the platinum wire or bending the leads directly with hands;

Cleaning the temperature sensing end with organic solvents such as ethanol or acetone;

Using ordinary tape or non-high-temperature sealing materials in the junction box.

Required:

Operators must wear anti-static gloves;

Perform static resistance testing and pressure sealing testing after maintenance;

Establish equipment maintenance records, documenting the date, operator, torque value, calibration results, and batch number of replaced parts.

The maintenance of fixed-thread platinum resistance thermometers is essentially a systematic protection of material integrity, electrical insulation, and heat conduction paths. Every cleaning, every tightening, and every calibration is a silent promise of process safety and product quality.