What methods can shorten the heat treatment cycle of H13 material?

May 16, 2026

Leave a message

The core methods for shortening the heat treatment cycle of H13 material are optimizing process management, selecting local expedited service providers, and consolidating batch processing. This can reduce the cycle from 3-5 days to 1-3 days without sacrificing quality.

 

1. Key Measures to Effectively Shorten the Cycle

Measure Effect Explanation

Choose a Local Service Provider Reduces time by 1-2 days. Local Wuhan companies (such as Jingmo Technology and Wuhan Heat Treatment Plant) support "same-day delivery, next-day furnace entry," avoiding transportation delays.

Advance Furnace Scheduling Booking Eliminates waiting time. Negotiates with service providers to reserve furnace locations, avoiding delays due to production backlogs.

Expedited Testing Service Reduces time by 0.5-1 day. Pays 30%-50% for expedited service; hardness testing and reports can be completed within 6-12 hours.

Consolidated Batch Processing Improves efficiency by 30%+. Processes multiple workpieces in the same furnace, reducing the number of batch heating and cooling cycles and lowering unit time costs.

Case Study: A Wuhan company, through a "local + expedited + batch" combined strategy, completed heat treatment and testing within 48 hours, with a pass rate still exceeding 97%.

 

2. Compressibility Analysis of Process Steps

Step

Compressibility

Description

Order Waiting Time

Compressible

Can be reduced to 0 days through appointments and local service

Transportation Time

Compressible

Same-day delivery possible with local service

Quenching and Heat Preservation

Not Eliminable

Must be maintained according to workpiece thickness (every 25mm/hour) to ensure uniform core temperature

Tempering Time

Not Eliminable

At least 2 tempering cycles, each ≥2 hours, to prevent excessive residual stress

Nitriding Process

Extremely Compressible

Gas nitriding requires 40~60 hours; cannot be significantly shortened, otherwise it will affect layer depth and bonding strength.

Risk Warning: Any skipping of steps or shortening of core process time will lead to uneven hardness, cracking, or deformation, and the pass rate may decrease by more than 10%.

 

3. Recommended Practices for Safe and Speed-Up Processing

Prioritize connecting with local Wuhan service providers: such as Jingmo Technology and Wuhan Heat Treatment Plant, which have multi-furnace collaboration and expedited processing channels;

Complete stress-relief tempering in advance: Complete the stress-relief process before final heat treatment to avoid process conflicts;

Require complete process records: including furnace temperature profiles and hardness reports to ensure quality traceability.